About Project:

A full time Commissioning management team onsite for 20 months.
Commissioning of all HVAC systems in both the Data Centre and Support Areas.
Generation and execution of commissioning test packs.

Status
Project Complete
Completion Year
2026
Size

Two Storey Data Centre Facility of 45MW. The facility will be built over a total of 3 phases with Phase One 9MW and Phase Two and three 18Mw each.

Client
Confidential Data Centre, Dublin
Team

Commissioning Manager Engineer:

Lead Commissioning Engineer:
Lead Water Treatment Engineer:

8No. Commissioning/Water Treatment Team.

Documentation Controller.

Project includes:

Banner

KES Water Treatment has extensive experience in large scale critical steel pipe work systems flushing and dosing and provide pre-commissioning cleaning of LPHW, CHW, L2L systems as well as main line and domestic water system sterilizations.

Water Treatment

HVAC Commissioning

Heat Load Testing with 200kw & 500Kw Units